A full bathroom remodel was planned with the toilet relocated to the opposite wall for a better layout.
During planning we found the existing waste line ran the wrong direction for that relocation and the change would require significant floor work. A modified layout kept the toilet within reach of existing drainage.
Demolition then revealed a softened subfloor under the original toilet position — which we had flagged as likely and budgeted for.